Here I bring you the first delivery of a series of exams for the Professional Scrum Master (I) Certification. I hope you enjoy it and it could serve you to better prepare your Certification Exam.
Quiz-summary
0 of 87 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
Information
Scrum Master Certified (I) Exam. 87 questions in English
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 87 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
Pos. | Name | Entered on | Points | Result |
---|---|---|---|---|
Table is loading | ||||
No data available | ||||
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- Answered
- Review
-
Question 1 of 87
1. Question
1 pointsWho creates the increment?
Correct
Congrats! 1.
Incorrect
Incorrect. Only members of the Development Team create the Increment.
-
Question 2 of 87
2. Question
1 pointsWhat are the three pillars that uphold Scrum?
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions based on what is known. Three pillars uphold every implementation of empirical process control: transparency, inspection, and adaptation.
-
Question 3 of 87
3. Question
1 pointsWho is responsible for coping with incomplete artifact transparency?
Correct
Congrats! 1.
Incorrect
Incorrect. The Scrum Master’s job is to work with the Scrum Team and the organization to increase the transparency of the artifacts. This work usually involves learning, convincing, and change.
-
Question 4 of 87
4. Question
1 pointsHow does Definition of Done help the Scrum Team? Select three most applicable items.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. DoD is used to assess when work is complete on the product Increment. DoD guides the Development Team in knowing how many Product Backlog items it can select during a Sprint Planning. DoD ensures artifact transparency
-
Question 5 of 87
5. Question
1 pointsIt is a good practice to have from time to time a special technical Sprint that consists only of tasks removing the technical debt without implementing any new functionality.
Correct
Congrats! 1.
Incorrect
Incorrect. It is prohibited. The purpose of each Sprint is to deliver Increments of potentially releasable functionality that adhere to the Scrum Team’s current definition of Done.
-
Question 6 of 87
6. Question
1 pointsIt is normal to have a hardening Sprint to remove all technical debt and prepare the Product for upcoming release.
Correct
Congrats! 1.
Incorrect
Incorrect. It is not normal. Development Teams deliver an Increment of product functionality every Sprint. This Increment is usable, so a Product Owner may choose to immediately release it. So, there is nothing to prepare. Each increment contains only Done functionality that could be released immediately.
-
Question 7 of 87
7. Question
1 pointsDefinition of Done is created during the first Sprint and remains unchanged until the Product release.
Correct
Congrats! 1.
Incorrect
Incorrect. False. During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by adapting the definition of Done as appropriate.
-
Question 8 of 87
8. Question
1 pointsWho is responsible for creation of the Definition of Done?
Correct
Congrats! 1.
Incorrect
Incorrect. If the definition of Done for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. If Done for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of Done appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development teams on all of the Scrum Teams must mutually define the definition of Done.
-
Question 9 of 87
9. Question
1 pointsWho is allowed to participate in the Daily Scrum?
Correct
Congrats! 1.
Incorrect
Incorrect. The Daily Scrum is an internal meeting for the Development Team. If others are present, the Scrum Master ensures that they do not disrupt the meeting.
-
Question 10 of 87
10. Question
1 pointsWho is allowed to make changes in the Product Backlog? Select two options.
Correct
Congrats! 1. 2.
Incorrect
Incorrect. The Product Owner is the sole person responsible for the Product Backlog. However, he or she can delegate some work related to product backlog management to the Development Team.
-
Question 11 of 87
11. Question
1 pointsWhat are the three most applicable characteristics of the Product Owner?
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. Product Value Maximizer. Lead Facilitator of Key Stakeholder Involvement. Product Marketplace Expert
-
Question 12 of 87
12. Question
1 pointsWhat does Burn-down Chart show?
Correct
Congrats! 1.
Incorrect
Incorrect. Burn-down chart shows the evolution of remaining effort against time.
-
Question 13 of 87
13. Question
1 pointsWhat does Cone of Uncertainty show?
Correct
Congrats! 3.
Incorrect
Incorrect. The Cone of Uncertainty describes the evolution of the amount of uncertainty during a project.
-
Question 14 of 87
14. Question
1 pointsWhat should be taken into account for the Definition of Done? Select the two most appropriate items.
Correct
Congrats! 1. 2.
Incorrect
Incorrect. If the definition of Done for an increment is part of the conventions, standards or guidelines of the development organization, all Scrum Teams must follow it as a minimum. If Done for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a definition of Done appropriate for the product. If there are multiple Scrum Teams working on the system or product release, the development teams on all of the Scrum Teams must mutually define the definition of Done.
-
Question 15 of 87
15. Question
1 pointsWhat is the order of items in the Product Backlog?
Correct
Congrats! 2.
Incorrect
Incorrect. The Product Owner is responsible for placing the most valuable and clear items at the top of the Product Backlog.
-
Question 16 of 87
16. Question
1 pointsIf an item in the Sprint Backlog cannot be finished by the end of the Sprint (it turned out there is a lot more work to do than was estimated), the Sprint is cancelled.
Correct
Congrats! 1.
Incorrect
Incorrect. The Sprint is cancelled only in the case if the Sprint Goal became obsolete. If some work could not be done, the Sprint Backlog should be re-negotiated between the Product Owner and Development Team.
-
Question 17 of 87
17. Question
1 pointsAll the Scrum Teams working on the same product should have the same Sprint length.
Correct
Congrats! 1.
Incorrect
Incorrect. False. Scrum does not require having aligned Sprints for multiple teams.
-
Question 18 of 87
18. Question
1 pointsWhat does the word development mean in the context of Scrum? Select the best option.
Correct
Congrats! 5.
Incorrect
Incorrect. When the words develop and development are used in the Scrum Guide, they refer to complex work including software and hardware development, development and releasing of products and enhancements, development and sustaining product operational environments, research and identifying of viable markets and technologies, and even more.
-
Question 19 of 87
19. Question
1 pointsWhere can Scrum be used? Check all the applicable items.
Correct
Congrats! 1. 2. 3. 4. 5. 6.
Incorrect
Incorrect. Scrum has been used to develop software, hardware, embedded software, networks of interacting function, autonomous vehicles, schools, government, marketing, managing the operation of organizations and almost everything we use in our daily lives, as individuals and societies.. Scrum has been used extensively, worldwide, to:. Research and identify viable markets, technologies, and product capabilities;. Develop products and enhancements;. Release products and enhancements, as frequently as many times per day;. Develop and sustain Cloud (online, secure, on-demand) and other operational environments for product use; and,. Sustain and renew products.
-
Question 20 of 87
20. Question
1 pointsWhat is the essence of Scrum? Select the most appropriate option.
Correct
Congrats! 1.
Incorrect
Incorrect. The essence of Scrum is a small team of people. The individual team is highly flexible and adaptive. These strengths continue operating in single, several, many, and networks of teams that develop, release, operate and sustain the work and work products of thousands of people. They collaborate and interoperate through sophisticated development architectures and target release environments.
-
Question 21 of 87
21. Question
1 pointsSelect the five Scrum Values.
Correct
Congrats! 1. 2. 3. 4. 5.
Incorrect
Incorrect. The Scrum Guide recognizes the following Scrum Values: commitment, courage, focus, openness and respect.
-
Question 22 of 87
22. Question
1 pointsWho is responsible for promoting and supporting Scrum? Select the best choice.
Correct
Congrats! 1.
Incorrect
Incorrect. The Scrum Master is responsible for promoting and supporting Scrum as defined in the Scrum Guide. Scrum Masters do this by helping everyone understand Scrum theory, practices, rules, and values.
-
Question 23 of 87
23. Question
1 pointsThe Daily Scrum always should take exactly 15 minutes. For example, if your team managed doing it in 5 minutes, you should spend 10 more minutes on some useful team activity like Product Backlog refinement, but not more.
Correct
Congrats! 2.
Incorrect
Incorrect. All events in Scrum are time-boxed. It means that every event has a maximum duration. However, the Scrum Guide does not require a minimal duration for any event. As Scrum Teams mature, they can do some events faster (e.g. the Sprint Planning or the Sprint Retrospective).
-
Question 24 of 87
24. Question
1 pointsThe structure of the Daily Scrum is well-defined and constant. Every team member should answer the three main questions: /What did I do yesterday? /What will I do today? /Do I see any impediment?
Correct
Congrats! 1.
Incorrect
Incorrect. There is no any prescribed structure. The structure of the Daily Scrum is set by the Development Team and can be conducted in different ways if it focuses on progress toward the Sprint Goal. Some Development Teams will use questions, some will be more discussion based. It is still perfectly fine to use the questions, but other ways of conducting the meeting are also possible.
-
Question 25 of 87
25. Question
1 pointsImagine the following situation. At the Sprint Retrospective meeting the Scrum Team identified some improvements that can be done. What should the Scrum Team do? Select the best option.
Correct
Congrats! 1.
Incorrect
Incorrect. The Sprint Backlog makes visible all the work that the Development Team identifies as necessary to meet the Sprint Goal. To ensure continuous improvement, it includes at least one high priority process improvement identified in the previous Retrospective meeting.
-
Question 26 of 87
26. Question
1 pointsWhat is Scrum?
Correct
Congrats! 2.
Incorrect
Incorrect. No, Scrum is a framework within which people can address complex adaptive problems, while delivering valuable products.
-
Question 27 of 87
27. Question
1 pointsWhat comprises Scrum (select four)?
Correct
Congrats! 2. 4. 5. 6.
Incorrect
Incorrect. The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a specific purpose and is essential to Scrum’s success and usage. The rules of Scrum bind together the events, roles, and artifacts, governing the relationships and interaction between them.
-
Question 28 of 87
28. Question
1 pointsScrum recommends using only those Scrum components and rules which suit most for a particular project.
Correct
Congrats! 2.
Incorrect
Incorrect. Each component within the Scrum framework serves a specific purpose and is essential to Scrum’s success and usage.
-
Question 29 of 87
29. Question
1 pointsScrum is not a process or technique. True or False?
Correct
Congrats! 1.
Incorrect
Incorrect. Scrum is not a process, technique, or definitive method. Rather, it is a framework within which you can employ various processes and techniques.
-
Question 30 of 87
30. Question
1 pointsScrum is founded on
Correct
Congrats! 1.
Incorrect
Incorrect. Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions based on what is known.
-
Question 31 of 87
31. Question
1 pointsHow frequently should scrum users inspect Scrum artifacts and progress toward a Sprint Goal?
Correct
Congrats! 2.
Incorrect
Incorrect. Scrum users must frequently inspect Scrum artifacts and progress toward a Sprint Goal to detect undesirable variances. Their inspection should not be so frequent that inspection gets in the way of the work. Inspections are most beneficial when diligently performed by skilled inspectors at the point of work.
-
Question 32 of 87
32. Question
1 pointsIf an inspector determines that one or more aspects of a process deviate outside acceptable limits, when must an adjustment be made?
Correct
Congrats! 1.
Incorrect
Incorrect. If an inspector determines that one or more aspects of a process deviate outside acceptable limits, and that the resulting product will be unacceptable, the process or the material being processed must be adjusted. An adjustment must be made as soon as possible to minimize further deviation.
-
Question 33 of 87
33. Question
1 pointsThe Scrum Team consists of
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master.
-
Question 34 of 87
34. Question
1 pointsWhat are the two essential features a Scrum Team should possess?
Correct
Congrats! 1. 2.
Incorrect
Incorrect. Scrum Teams are self-organizing and cross-functional. Self-organizing teams choose how best to accomplish their work, rather than being directed by others outside the team. Cross-functional teams have all competencies needed to accomplish the work without depending on others not part of the team.
-
Question 35 of 87
35. Question
1 pointsWhat are the three main qualities the team model in Scrum is designed to optimize?
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The team model in Scrum is designed to optimize flexibility, creativity, and productivity.
-
Question 36 of 87
36. Question
1 pointsWho is responsible for managing the Product Backlog?
Correct
Congrats! 1.
Incorrect
Incorrect. The Product Owner is the sole person responsible for managing the Product Backlog.
-
Question 37 of 87
37. Question
1 pointsWhat does Product Backlog management include? Select three most applicable items.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. Product Backlog management includes:. Clearly expressing Product Backlog items;. Ordering the items in the Product Backlog to best achieve goals and missions;. Optimizing the value of the work the Development Team performs;. Ensuring that the Product Backlog is visible, transparent, and clear to all, and shows what the Scrum Team will work on next; and,. Ensuring the Development Team understands items in the Product Backlog to the level needed.
-
Question 38 of 87
38. Question
1 pointsIt is a good practice to have at least two Product Owners on big projects.
Correct
Congrats! 1.
Incorrect
Incorrect. The Product Owner is one person, not a committee, but the Product Owner may represent the desires of a committee in the Product Backlog.
-
Question 39 of 87
39. Question
1 pointsWhat are the characteristics of a Development Team? Select three most appropriate choices.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. Development Teams have the following characteristics:. They are self-organizing. No one (not even the Scrum Master) tells the Development Team how to turn Product Backlog into Increments of potentially releasable functionality;. Development Teams are cross-functional, with all of the skills as a team necessary to create a product Increment;. Scrum recognizes no titles for Development Team members, regardless of the work being performed by the person;. Scrum recognizes no sub-teams in the Development Team, regardless of domains that need to be addressed like testing, architecture, operations, or business analysis; and,. Individual Development Team members may have specialized skills and areas of focus, but accountability belongs to the Development Team as a whole.
-
Question 40 of 87
40. Question
1 pointsImagine you are a Scrum Master in a small Organization that tries to adopt Scrum. There are 10 developers and the Product Owner. How can they be divided into teams? Choose all applicable options:
Correct
Congrats! 2. 3.
Incorrect
Incorrect. Number of people in a Development Team should be between 3 and 9. Each team should be cross-functional and self-organized.. Optimal Development Team size is small enough to remain nimble and large enough to complete significant work within a Sprint. Fewer than three Development Team members decrease interaction and results in smaller productivity gains. Having more than nine members requires too much coordination. The Product Owner and Scrum Master roles are not included in this count unless they are also executing the work of the Sprint Backlog.
-
Question 41 of 87
41. Question
1 pointsCould the Product Owner and the Scrum Master be a part of the Development Team?
Correct
Congrats! 1.
Incorrect
Incorrect. Yes. Scrum does not prohibit the Product Owner or the Scrum Master do development work. However, it is not the best practice because it could create a conflict of interest.
-
Question 42 of 87
42. Question
1 pointsThe Scrum Master is focused primarily on the Scrum Team and usually does not care about those outside the Scrum Team.
Correct
Congrats! 2.
Incorrect
Incorrect. The Scrum Master is a servant-leader for the Scrum Team. The Scrum Master helps those outside the Scrum Team understand which of their interactions with the Scrum Team are helpful and which aren’t. The Scrum Master helps everyone change these interactions to maximize the value created by the Scrum Team.
-
Question 43 of 87
43. Question
1 pointsHow does the Scrum Master help the Product Owner? Select the three most appropriate answers.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The Scrum Master serves the Product Owner in several ways, including:. Ensuring that goals, scope, and product domain are understood by everyone on the Scrum Team as well as possible;. Finding techniques for effective Product Backlog management;. Helping the Scrum Team understand the need for clear and concise Product Backlog items;. Understanding product planning in an empirical environment;. Ensuring the Product Owner knows how to arrange the Product Backlog to maximize value;. Understanding and practicing agility; and,. Facilitating Scrum events as requested or needed.
-
Question 44 of 87
44. Question
1 pointsHow does the Scrum Master serve the Development Team? Select the three most appropriate answers.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The Scrum Master serves the Development Team in several ways, including:. Coaching the Development Team in self-organization and cross-functionality;. Helping the Development Team to create high-value products;. Removing impediments to the Development Team’s progress;. Facilitating Scrum events as requested or needed; and,. Coaching the Development Team in organizational environments in which Scrum is not yet fully adopted and understood.
-
Question 45 of 87
45. Question
1 pointsHow does the Scrum Master serve the Organization? Select the three most appropriate answers.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The Scrum Master serves the organization in several ways, including:. Leading and coaching the organization in its Scrum adoption;. Planning Scrum implementations within the organization;. Helping employees and stakeholders understand and enact Scrum and empirical product development;. Causing change that increases the productivity of the Scrum Team; and,. Working with other Scrum Masters to increase the effectiveness of the application of Scrum in the organization.
-
Question 46 of 87
46. Question
1 pointsSort Scrum events in the right order.
-
1. Sprint Planning
-
2. Daily Scrum
-
3. Sprint Review
-
4. Sprint Retrospective
Correct
Congrats! 1. 2. 3. 4.
Incorrect
Incorrect. A sprint begins with Sprint Planning, then there are several Daily Scrum meetings following by Sprint Review and then Sprint Retrospective.
-
-
Question 47 of 87
47. Question
1 pointsPlease, select a time-box for each Scrum event. Sort elements Sprint Planning Daily Scrum Sprint Review Sprint Retrospective
-
1. 8 hours or less - Sprint Planning/ 15 minutes - Daily Sprint/ 4 hours or less - Sprint Review - 3 hours or less - Sprint Retrospective
-
1. 8 hours or less - Sprint Review/ 15 minutes - Daily Sprint/ 4 hours or less - Sprint Planning - 3 hours or less - Sprint Retrospective
-
1. 8 hours or less - Sprint Planning/ 15 minutes - Daily Sprint/ 4 hours or less - Sprint Retrospective - 3 hours or less - Sprint Review
Correct
Congrats! 1.
Incorrect
Incorrect. Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.. The Daily Scrum is a 15-minute time-boxed event for the Development Team to synchronize activities and create a plan for the next 24 hours.. Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.. Sprint Retrospective is a three-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is usually shorter.
-
-
Question 48 of 87
48. Question
1 pointsScrum does not allow additional meetings that are not defined in Scrum.
Correct
Congrats! 2.
Incorrect
Incorrect. Scrum allows additional meetings if they facilitate achieving the Sprint Goal.
-
Question 49 of 87
49. Question
1 pointsIs it allowed to skip the Daily Scrum if there is nothing interesting to talk about?
Correct
Congrats! 2.
Incorrect
Incorrect. Each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection. Failure to include any of these events results in reduced transparency and is a lost opportunity to inspect and adapt.
-
Question 50 of 87
50. Question
1 pointsWhat happens during the Sprint? Select three answers.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. During the Sprint:. No changes are made that would endanger the Sprint Goal;. Quality goals do not decrease; and,. Scope may be clarified and re-negotiated between the Product Owner and Development Team as more is learned.
-
Question 51 of 87
51. Question
1 pointsWho has the authority to cancel the Sprint?
Correct
Congrats! 2.
Incorrect
Incorrect. Only the Product Owner has the authority to cancel the Sprint, although he or she may do so under influence from the stakeholders, the Development Team, or the Scrum Master.
-
Question 52 of 87
52. Question
1 pointsWhat happens when a Sprint is cancelled? Select three.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. When a Sprint is cancelled, any completed and Done Product Backlog items are reviewed. If part of the work is potentially releasable, the Product Owner typically accepts it. All incomplete Product Backlog Items are re-estimated and put back on the Product Backlog.
-
Question 53 of 87
53. Question
1 pointsWhat provides guidance to the Development Team on why it is building the Increment?
Correct
Congrats! 1.
Incorrect
Incorrect. The Sprint Goal is an objective set for the Sprint that can be met through the implementation of Product Backlog. It provides guidance to the Development Team on why it is building the Increment.
-
Question 54 of 87
54. Question
1 pointsWho is responsible for crafting the Sprint Goal at the Sprint Planning?
Correct
Congrats! 2.
Incorrect
Incorrect. After the Development Team forecasts the Product Backlog items it will deliver in the Sprint, the Scrum Team crafts a Sprint Goal.
-
Question 55 of 87
55. Question
1 pointsWho participates in the Sprint Planning? Select three.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.
-
Question 56 of 87
56. Question
1 pointsHow much time does the Sprint Planning take?
Correct
Congrats! 2.
Incorrect
Incorrect. Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint.
-
Question 57 of 87
57. Question
1 pointsWhat are the questions the Sprint Planning answers? Select two.
Correct
Congrats! 1. 2.
Incorrect
Incorrect. Sprint Planning answers the following:. What can be delivered in the Increment resulting from the upcoming Sprint?. How will the work needed to deliver the Increment be achieved?
-
Question 58 of 87
58. Question
1 pointsWhat is the input to the Sprint Planning? Select four.
Correct
Congrats! 1. 2. 3. 4.
Incorrect
Incorrect. The input to the Sprint Planning is the Product Backlog, the latest product Increment, projected capacity of the Development Team during the Sprint, and past performance of the Development Team.
-
Question 59 of 87
59. Question
1 pointsThe Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.
Correct
Congrats! 2.
Incorrect
Incorrect. By the end of the Sprint Planning, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.
-
Question 60 of 87
60. Question
1 pointsCould the Sprint Planning be finished if only work planned for the first days of the Sprint is decomposed to units of one day or less?
Correct
Congrats! 1.
Incorrect
Incorrect. The Scrum Guide requires only the work planned for the first days of the Sprint is decomposed by the end of the Sprint Planning, often to units of one day or less. However, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment.
-
Question 61 of 87
61. Question
1 pointsOther people than the Scrum Team can attend the Sprint Planning in order to provide technical or domain advice.
Correct
Congrats! 1.
Incorrect
Incorrect. The Development Team may also invite other people to attend in order to provide technical or domain advice.
-
Question 62 of 87
62. Question
1 pointsOnly the Product Owner and the Development Team participate in the Sprint Planning. There is nothing to do for the Scrum Master.
Correct
Congrats! 1.
Incorrect
Incorrect. The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team.
-
Question 63 of 87
63. Question
1 pointsThe Daily Scrum time-box depends on the size of the Development team.
Correct
Congrats! 1.
Incorrect
Incorrect. The Daily Scrum is a 15-minute time-boxed event for the Development Team of any size.
-
Question 64 of 87
64. Question
1 pointsCheck all the formal opportunities to inspect and adapt.
Correct
Congrats! 1. 2. 3. 4.
Incorrect
Incorrect. Other than the Sprint itself, which is a container for all other events, each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection.
-
Question 65 of 87
65. Question
1 pointsSelect the two meetings in which people outside the Scrum Team are allowed to participate.
Correct
Congrats! 1. 2.
Incorrect
Incorrect. The Development Team may invite other people to attend the Sprint Planning in order to provide technical or domain advice.. The Product Owner is responsible for inviting the Key Stakeholders to the Sprint Review meeting
-
Question 66 of 87
66. Question
1 pointsIn which meetings the Key Stakeholders are allowed to participate?
Correct
Congrats! 1.
Incorrect
Incorrect. The Key Stakeholders are allowed to participate only in the Sprint Review meeting. However, any member of the Scrum Team can interact with them any time.
-
Question 67 of 87
67. Question
1 pointsWhat are the three questions the Scrum Guide gives as an example that can be used at the Daily Scrum?
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The structure of the Daily Scrum is set by the Development Team and can be conducted in different ways if it focuses on progress toward the Sprint Goal. Some Development Teams will use questions, some will be more discussion based. Here is an example of what might be used:. What did I do yesterday that helped the Development Team meet the Sprint Goal?. What will I do today to help the Development Team meet the Sprint Goal?. Do I see any impediment that prevents me or the Development Team from meeting the Sprint Goal?
-
Question 68 of 87
68. Question
1 pointsThe Scrum Master does the following regarding the Daily Scrum (select all applicable variants):
Correct
Congrats! 1. 3. 4.
Incorrect
Incorrect. The Scrum Master. Ensures that the Development Team has the meeting, but the Development Team is responsible for conducting the Daily Scrum.. Teaches the Development Team to keep the Daily Scrum within the 15-minute time-box.. If others are present at the Daily Scrum, ensures that they do not disrupt the meeting.
-
Question 69 of 87
69. Question
1 pointsWhat is the result of the Sprint Review?
Correct
Congrats! 1.
Incorrect
Incorrect. The result of the Sprint Review is a revised Product Backlog that defines the probable Product Backlog items for the next Sprint. The Product Backlog may also be adjusted overall to meet new opportunities.
-
Question 70 of 87
70. Question
1 pointsWho participates in the Sprint Review? Select all applicable variants.
Correct
Congrats! 1. 2. 3. 4.
Incorrect
Incorrect. During the Sprint Review, the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based on that and any changes to the Product Backlog during the Sprint, attendees collaborate on the next things that could be done to optimize value.
-
Question 71 of 87
71. Question
1 pointsWhat is the Sprint Retrospective?
Correct
Congrats! 1.
Incorrect
Incorrect. The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint.
-
Question 72 of 87
72. Question
1 pointsDefinition of Done can be reviewed and adapted during each Sprint Retrospective. True or False?
Correct
Congrats! 1.
Incorrect
Incorrect. During each Sprint Retrospective, the Scrum Team plans ways to increase product quality by improving work processes or adapting the definition of Done, if appropriate and not in conflict with product or organizational standards.
-
Question 73 of 87
73. Question
1 pointsThe purpose of the Sprint Retrospective is to (select three):
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The purpose of the Sprint Retrospective is to:. Inspect how the last Sprint went with regards to people, relationships, process, and tools;. Identify and order the major items that went well and potential improvements; and,. Create a plan for implementing improvements to the way the Scrum Team does its work.
-
Question 74 of 87
74. Question
1 pointsWhat part of the capacity of the Development Team does Product Backlog refinement usually consume?
Correct
Congrats! 1.
Incorrect
Incorrect. Product Backlog refinement usually consumes no more than 10% of the capacity of the Development Team.
-
Question 75 of 87
75. Question
1 pointsWho is responsible for monitoring progress toward high-level goals?
Correct
Congrats! 1.
Incorrect
Incorrect. The Product Owner tracks total work remaining at least every Sprint Review. The Product Owner compares this amount with work remaining at previous Sprint Reviews to assess progress toward completing projected work by the desired time for the goal. This information is made transparent to all stakeholders.
-
Question 76 of 87
76. Question
1 pointsWhat are the Scrum Artifacts? Select all applicable items.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. The Scrum artifacts are Product Backlog, Sprint Backlog and Increment.
-
Question 77 of 87
77. Question
1 pointsWhat could be a source of requirements for any changes to be made to the product?
Correct
Congrats! 1.
Incorrect
Incorrect. The Product Backlog is an ordered list of everything that might be needed in the product and is the single source of requirements for any changes to be made to the product.
-
Question 78 of 87
78. Question
1 pointsWho is responsible for the Product Backlog?
Correct
Congrats! 1.
Incorrect
Incorrect. The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering.
-
Question 79 of 87
79. Question
1 pointsWhat are Product Backlog features? Select three.
Correct
Congrats! 1. 2. 3.
Incorrect
Incorrect. A Product Backlog is never complete. The earliest development of it only lays out the initially known and best-understood requirements. The Product Backlog evolves as the product and the environment in which it will be used evolves. The Product Backlog is dynamic; it constantly changes to identify what the product needs to be appropriate, competitive, and useful. As long as a product exists, its Product Backlog also exists.
-
Question 80 of 87
80. Question
1 pointsAll Development Teams working on the same Product should use the same Product Backlog.
Correct
Congrats! 1.
Incorrect
Incorrect. Multiple Scrum Teams often work together on the same product. One Product Backlog is used to describe the upcoming work on the product.
-
Question 81 of 87
81. Question
1 pointsWho is responsible for all estimates in the Product Backlog?
Correct
Congrats! 1.
Incorrect
Incorrect. The Development Team is responsible for all estimates in the Product Backlog. The Product Owner may influence the Development Team by helping it understand and select trade-offs, but the people who will perform the work make the final estimate.
-
Question 82 of 87
82. Question
1 pointsWhat is the Sprint Backlog?
Correct
Congrats! 1.
Incorrect
Incorrect. The Sprint Backlog is the set of Product Backlog items selected for the Sprint, plus a plan for delivering the product Increment and realizing the Sprint Goal.
-
Question 83 of 87
83. Question
1 pointsThe Sprint Backlog is created at the Sprint Planning. It is prohibited to add new work into the Sprint Backlog later by the Development Team.
Correct
Congrats! 1.
Incorrect
Incorrect. The Development Team modifies the Sprint Backlog throughout the Sprint, and the Sprint Backlog emerges during the Sprint. This emergence occurs as the Development Team works through the plan and learns more about the work needed to achieve the Sprint Goal. As new work is required, the Development Team adds it to the Sprint Backlog.
-
Question 84 of 87
84. Question
1 pointsWhat belongs solely to the Development Team?
Correct
Congrats! 1.
Incorrect
Incorrect. Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.
-
Question 85 of 87
85. Question
1 pointsWho is responsible for tracking the total work remaining in the Sprint Backlog to project the likelihood of achieving the Sprint Goal?
Correct
Congrats! 1.
Incorrect
Incorrect. At any point in time in a Sprint, the total work remaining in the Sprint Backlog can be summed. The Development Team tracks this total work remaining at least for every Daily Scrum to project the likelihood of achieving the Sprint Goal. By tracking the remaining work throughout the Sprint, the Development Team can manage its progress.
-
Question 86 of 87
86. Question
1 pointsWho is allowed to change the Sprint Backlog during the Sprint?
Correct
Congrats! 1.
Incorrect
Incorrect. Only the Development Team can change its Sprint Backlog during a Sprint. The Sprint Backlog is a highly visible, real-time picture of the work that the Development Team plans to accomplish during the Sprint, and it belongs solely to the Development Team.
-
Question 87 of 87
87. Question
1 pointsWhat is the Increment?
Correct
Congrats! 2.
Incorrect
Incorrect. The Increment is the sum of all the Product Backlog items completed during the Sprint and the value of the increments of all previous Sprints.