Here I bring you the third delivery of a series of exams for the Professional Scrum Master (I) Certification. I hope you enjoy it and it may serve you to better prepare your Certification Exam.
Quiz-summary
0 of 77 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
Information
Quiz description Scrum Master Certified I. 77 questions
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 77 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- Answered
- Review
-
Question 1 of 77
1. Question
1 pointsWhich of the following is the most proper situation during the Sprint Planning considering that we have seven Scrum Teams working in a single product?
Correct
Congrats! 1.
Incorrect
Incorrect: There’s only one Product Backlog and one Product Owner for one product. Each team needs to have a separate Sprint Backlog, however.: The Development Team is responsible for selecting the items from the Product Backlog, however, they can select representatives to do so. They share ownership on these though.: Team members can change the composition of teams (shift) between Sprints.: Even though Product Backlog items should be independent of each other, the dependencies between teams are unavoidable in scaled Scrum and they need to be handled.
-
Question 2 of 77
2. Question
1 pointsThe Development Team should prepare a complete infrastructure and set of tools for the project during the first Sprint.
Correct
Congrats! 1.
Incorrect
Incorrect: The Development Team neither analyze, design nor describe the complete architecture and infrastructure, beforehand for the whole project. Agile processes are characterized by frequent short bursts of design, just enough to reach the Sprint Goal.
-
Question 3 of 77
3. Question
1 pointsWhat two approaches should the Scrum Master take when your team doesn’t have the proper infrastructure to do the work needed to complete the selected Product Backlog items?
Correct
Congrats! 2. 5.
Incorrect
Incorrect: The infrastructure and tools are prepared gradually throughout the project, and the Sprint Goal and Definition of Done should be realistic and created accordingly.
-
Question 4 of 77
4. Question
1 pointsIs at most a four-hour meeting for one-month Sprints.
Correct
Congrats! 3.
Incorrect
Incorrect: The Sprint Review is at most a four-hour meeting for one-month Sprints. For shorter Sprints, the event is usually shorter. During this event, the Scrum Team and stakeholders collaborate about what was done in the Sprint, so is an opportunity for inspection and adaptation.
-
Question 5 of 77
5. Question
1 pointsAlways must be a Release after each Sprint.
Correct
Congrats! 2.
Incorrect
Incorrect: The main purpose of the Sprint is to create an increment of useable, and potentially releasable “Done” product.
-
Question 6 of 77
6. Question
1 pointsWhich three of the following are true about the Scrum Master role?
Correct
Congrats! 1. 2. 5.
Incorrect
Incorrect: Despite the Scrum Master doesn’t manage people, he manages the processes. That’s why it’s considered a management role. The Development Team is self-organized; the Scrum Master can coach and help but the developers are who handle the progress and performance of the Sprints. It is the Product Owner who owns the Product Backlog.
-
Question 7 of 77
7. Question
1 pointsWhat is the best approach when a developer is not working properly?
Correct
Congrats! 4.
Incorrect
Incorrect: The Development Team is responsible about its members because it’s self-organized, this means its member decides about removing any member from the team. Since this situation is actually an impediment, the Scrum Master can help the team.
-
Question 8 of 77
8. Question
1 pointsWhich three things are Scrum Master responsibilities during the Sprint?
Correct
Congrats! 2. 3. 5.
Incorrect
Incorrect: The Scrum Master is responsible for helping everyone understand Scrum theory, practices, rules, and values. Removes impediments (solves problems), facilitates the meetings as needed. The whole Scrum Team decides the Sprint length considering one month for the maximum duration. Tasks are assigned by the Developers themselves.
-
Question 9 of 77
9. Question
1 pointsWhich are three reasons why to include tests in the Definition of “Done” is a good practice?
Correct
Congrats! 1. 3. 4.
Incorrect
Incorrect: We need to know when an item is really Done, in other words, we share a common understanding of what means a finished job. With this purpose, we can increase Transparency when there are tests included in the Definition of “Done”, which will verify how close is the work of being “complete”, “potentially releasable” and becoming a real Increment usable for final users.: Also writing acceptance tests help to express many of the details that result from the conversations between customers and Scrum Teams, rather than writing long lists of “The system shall…”.: What should be the duration of a Sprint?| 1. Sufficiently short to maintain acceptable business risks for the product owner.| 2. No more than one month.| 3. All the answers are correct.| 4. Short enough to be able to synchronize the development work with other business processes.
-
Question 10 of 77
10. Question
1 pointsWho estimates the work during the Sprint?
Correct
Congrats! 1.
Incorrect
Incorrect: Since people who actually do the work are the ones who best know what is needed to complete specific tasks; all estimates are done by the Development Team.: Hardening Sprints are needed every few Sprints, to resolve dependencies and reduce technical debt.|Â Â True|Â Â False
-
Question 11 of 77
11. Question
1 pointsThe Sprint is over when…
Correct
Congrats! 1.
Incorrect
Incorrect: Scrum timeboxed events are not extendable, you can take the available time for some these events as maximum duration, so they can be finished earlier if everything is done, but Sprint timeboxes have a fixed duration, this means they can not shrink. If everything is finished before the end of the Sprint, the Development Team will pick the next item from the Product Backlog and starts working on that.
-
Question 12 of 77
12. Question
1 pointsWhat is an important way for the Scrum Master to increase the productivity of the Development Team?
Correct
Congrats! 2.
Incorrect
Incorrect: The Scrum Master serves the Development Team in several ways like:: Coaching the Development Team in self-organization and cross-functionality.: Helping the Development Team to create high-value products.: Removing impediments to the Development Team’s progress.: Facilitating Scrum events as requested or needed.: Coaching the Development Team in organizational environments in which Scrum is not yet fully adopted and understood.
-
Question 13 of 77
13. Question
1 pointsDuring the Sprint Planning that is moving ahead, the Development Team has become aware they won’t be able to finish the work for all selected Sprint Backlog items. Which two of the following are usually the best actions?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: Even if the team doesn’t deliver increment the Product Owner must be informed about it, and s:he must work with the Development Team and adjust, add, and:or remove Sprint Backlog Items through the Sprint in order to achieve the Sprint Goal. But, since this is still the Sprint Planning we also still have the chance to modify de Sprint Goal, we won’t able to do so after the Sprint Planning.: We always work on a regular and constant pace, we shouldn’t work overtime.: We shouldn’t change the number of developers, adding developers won’t increase productivity in short term.
-
Question 14 of 77
14. Question
1 pointsHow should the members of multiple teams be composed for a single project?
Correct
Congrats! 3.
Incorrect
Incorrect: Developers should be self-organized and they’re responsible for teams formations and composition.
-
Question 15 of 77
15. Question
1 pointsA Scrum Team must have at least one Release Sprint.
Correct
Congrats! 1.
Incorrect
Incorrect: The purpose of all Sprints is to create an Increment of “Done” work, a piece of working software usable and potentially releasable, however team doesnt need realese every Sprint, but eventually, the team must release its work.
-
Question 16 of 77
16. Question
1 pointsDuring the Sprint the Development Team determines that cannot complete its work by the end of the Sprint. What happens in this case?
Correct
Congrats! 4.
Incorrect
Incorrect: The current Sprint continues. The Product Owner and the Development Team will review and adjust the Sprint work selected, always following the Sprint Goal.
-
Question 17 of 77
17. Question
1 pointsScrum is methodology which describes detailed steps to get working software.
Correct
Congrats! 1.
Incorrect
Incorrect: Scrum doesn’t describe any detailed step, and rather than a methodology is a framework.
-
Question 18 of 77
18. Question
1 pointsEventually, the Scrum Master becomes unnecessary when the Development Team matures through the project.
Correct
Congrats! 2.
Incorrect
Incorrect: If a project does not include Scrum Master or Product Owner roles, this project is not doing Scrum. Both roles can be part-time but always are performed in a Scrum project. One of the must important Scrum Master activities is removing impediments, and it doesn’t matter how mature is the Development Team, its members will be always benefited when someone takes care of these issues.
-
Question 19 of 77
19. Question
1 pointsThe Sprint Backlog contains items pulled only from the Product Backlog.
Correct
Congrats! 1.
Incorrect
Incorrect: We can’t change the Sprint Goal, however, the team can talk and negotiate with the Product Owner in order to add new Sprint Backlog Items as needed.
-
Question 20 of 77
20. Question
1 pointsWhat is the best Scrum description?
Correct
Congrats! 4.
Incorrect
Incorrect: Scrum is a framework which is adaptative and empirical rather than theoretical, thus it can be used for the development of complex products in complex environments. Scrum is more about project delivery than project management, therefore is neither a methodology nor body of knowledge.
-
Question 21 of 77
21. Question
1 pointsWhich are three responsibilities of a self-organizing team?
Correct
Congrats! 1. 3. 4.
Incorrect
Incorrect: It’s the responsibility of the Development Team to select the appropriate number of Product Backlog items, break down the tasks and create estimations for them each Sprint.
-
Question 22 of 77
22. Question
1 pointsWhat represents the trend line in a burndown chart, thorough a Sprint?
Correct
Congrats! 3.
Incorrect
Incorrect: The trend line gives us visibility about the forecast for the finishing date, considering a constant development team Capacity for the Sprint Backlog.
-
Question 23 of 77
23. Question
1 pointsWhich are two good approaches for the Development Team to make non-functional requirements visible?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: The Product Owner is the sole person responsible for managing the Product Backlog but always can and must consider the feedback and opinion from other stakeholders including the Development Team who can influence to add new items in Product Backlog. Good requirements should be brieg enough, that’s why acceptance tests can be used to express many of the details that result from the conversations between customers, users, Product Owners and developers, including non-functional requirements. One product only has one Product Backlog.
-
Question 24 of 77
24. Question
1 pointsWhat is an output of a Sprint?
Correct
Congrats! 1.
Incorrect
Incorrect: The purpose of the Sprints is creating increments; in other words, a piece of working product which is potentially shippable and based on the agreed Definition of “Done”, regardless of the techniques, documents or methods used to achieve this.
-
Question 25 of 77
25. Question
1 pointsWho’s responsible for communicating and engaging the stakeholders?
Correct
Congrats! 3.
Incorrect
Incorrect: Product Owners should communicate effectively with the customers therefore also engaging them.
-
Question 26 of 77
26. Question
1 pointsChoose two purposes of Definition of Done.
Correct
Congrats! 1. 2.
Incorrect
Incorrect: Everyone in the Scrum TEam must understand what “Done” means. Although this may vary significantly per Scrum Team, members must have a shared understanding of what it means for work to be complete, to ensure transparency. This is the definition of “Done” for the Scrum Team and is used to assess when work is complete on the product Increment.
-
Question 27 of 77
27. Question
1 pointsHow much of the Sprint Backlog needs to be defined throughout the Sprint Planning meeting?
Correct
Congrats! 2.
Incorrect
Incorrect: Scrum does not do upfront planning, only a few tasks broken down from the items are created in the Sprint Planning.: The Development Team is self-organized, their members decide who does what.: There is no baseline for a Scrum project.
-
Question 28 of 77
28. Question
1 pointsLower positioned, Product Backlog items, are usually larger and less clear than those on the top.
Correct
Congrats! 2.
Incorrect
Incorrect: When Product Backlog is created, items are added to it. They have different sizes and eventually are ordered on their business value. The most valued items will be on the top and usually, these items would be broken down into smaller ones. We don’t do this with those items on the bottom. That’s why usually larger and less clear items are on the bottom of the Product Backlog.
-
Question 29 of 77
29. Question
1 pointsWhat is the proper way to ordering Product Backlog items?
Correct
Congrats! 1.
Incorrect
Incorrect: The Product Backlog items are ordered accordingly based on their business value. The Product Owner is responsible for the Product Backlog, including its content, availability, and ordering. The Product Owner can consider items size and risk, but among others, these are only criteria to establish final value. Items should be independent of each other, in order to facilitate their ordering.
-
Question 30 of 77
30. Question
1 pointsEach Sprint Backlog item is owned by one or more developers.
Correct
Congrats! 2.
Incorrect
Incorrect: The whole Developer Teams share the Sprint Backlog items ownership and their tasks; these tasks assigned to the Developers by themselves. Also, all members of the Developer Team share the accountability of their own tasks.
-
Question 31 of 77
31. Question
1 pointsIn this event, the Scrum Team and stakeholders talk and collaborate about what was done in the Sprint, in order to share the Sprint progress.
Correct
Congrats! 3.
Incorrect
Incorrect: The Sprint Review event is held at the end of the Sprint to inspect the Increment and adapt the Product Backlog if needed. Attendees also collaborate on the next things that could be done to optimize value.
-
Question 32 of 77
32. Question
1 pointsWhat amount of work should the Development Team do to a selected Product Backlog item to complete the Sprint?
Correct
Congrats! 2.
Incorrect
Incorrect: The agreed definition of “Done” for the Scrum Team, is used to assess when work is complete on the product Increment in order to deliver an Increments of potentially releasable functionality.
-
Question 33 of 77
33. Question
1 pointsMultiple Scrum Teams should use the definition of “Ready” to normalize estimations. This way it will be easier to measure and compare their performance
Correct
Congrats! 2.
Incorrect
Incorrect: There are no comparable estimation units between the Development Teams, each team is different. If you try to normalize, you can lead to misunderstandings and padding problems.: Definition of “Ready” is a common practice but is not part of the Scrum guide, and its purpose is neither to normalize estimations nor performance measuring.
-
Question 34 of 77
34. Question
1 pointsWhich two of the following are the result of the Sprint Planning?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: The Sprint Goal and Sprint Backlog are created during the Sprint Planning meeting.
-
Question 35 of 77
35. Question
1 pointsWhen can the composition of the Development Team change?
Correct
Congrats! 4.
Incorrect
Incorrect: Development Team should try to avoid team members changes during the Sprint because it creates a short time reduction in the productivity, but if any change is a real need and the Development Team thinks this would help them to meet the Sprint Goal, then do the change.
-
Question 36 of 77
36. Question
1 pointsThe Sprint Backlog contains only pulled items from Product Backlog.
Correct
Congrats! 1.
Incorrect
Incorrect: Certainly, the Sprint Backlog contains the selected Product Backlog items but also contains the tasks for the current Sprint.
-
Question 37 of 77
37. Question
1 pointsWhat does it mean for the Development Team to be a Cross-Functional team?
Correct
Congrats! 2.
Incorrect
Incorrect: Cross-Functional means that the professionals in the Team Development should have the all the expertise to do the necessary work in order to deliver a potentially releasable Increment of “Done” product at the end of each Sprint.
-
Question 38 of 77
38. Question
1 pointsThe Sprint Backlog includes…
Correct
Congrats! 4.
Incorrect
Incorrect: User Stories, Use Cases, Tests, Tasks and even other elements which help to define and clarify the work can be part of the Sprint Backlog.
-
Question 39 of 77
39. Question
1 pointsThe Product Owner wants to create estimations and ask the Scrum Master for guidance about it. What is the most proper guideline that the Scrum Master should give?
Correct
Congrats! 4.
Incorrect
Incorrect: Only members of the Development Team create the Increment and are the best suited Scrum Team members to do estimations. The Product Owner and the Scrum Master can suggest and use techniques to help the development team to measure their effort, however, only the Development Team does the estimation itself.
-
Question 40 of 77
40. Question
1 pointsWhat is the level of definition needed for the Sprint Backlog through the Sprint Planning?
Correct
Congrats! 4.
Incorrect
Incorrect: The Sprint Planning priority is answering two : What can be delivered in the Increment resulting from the upcoming Sprint?: How will the work needed to deliver the Increment be achieved?: The team doesn’t need to get all the detail about every task as long these
-
Question 41 of 77
41. Question
1 pointsWhich are two reason Scrum promotes self-organized teams?
Correct
Congrats! 2. 4.
Incorrect
Incorrect: Being self-organized implies that the team follows its very own process, rather than receiving orders. When it’s so, the members of the team tend to commit themselves and increase their accountability, and creativity.
-
Question 42 of 77
42. Question
1 pointsWhat is the most important subject that the Scrum Team should resolve during Sprint zero?
Correct
Congrats! 2.
Incorrect
Incorrect: There’s no such thing as Sprint zero. The first Sprint is the first one, and it’s not different from other Sprints, from the perspective that the Developer Team should create an Increment. The infrastructure, tools, and requirements are prepared gradually throughout the project.
-
Question 43 of 77
43. Question
1 pointsWhich two answers are true about the Definition of “Done”?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: The Definition of “Done” defines what is expected as result of the current Sprint. This include (but not limited) to acceptance criteria and non-functional features. The purpose is to share the same understanding of the completed work to increase transparency.: The Sprint Goal is what defines the purpose of the Sprint.: The Development Team must have present that the Definition of “Done” to create tasks, but also the description of each pulled Product Backlog items.
-
Question 44 of 77
44. Question
1 pointsThe CTO of your organization and one of the most important clients ask some members of the Development Team to add a new feature in the middle of the Sprint. What should they do?
Correct
Congrats! 4.
Incorrect
Incorrect: One the main responsibilities of the Product Owner is to maximize the value of the Development Team’s work, and he’s the only one who can add new items to the Product Backlog. Even when the Development Team owns the Sprint Backlog, the members don’t add items arbitrarily, the Product Owner must make sure that any new item adds value and she or he can work with proper stakeholders about it and then add it to the Product Backlog for the next Sprints. Also, the Product Owner can reject the new feature, rather than the Development Team.
-
Question 45 of 77
45. Question
1 pointsThe Development Team and the Product Owner are not working together at all. What should the Scrum Master do?
Correct
Congrats! 2.
Incorrect
Incorrect: The Scrum Master must coach the whole Scrum Team members in organizational environments in which Scrum is not yet fully adopted and understood to practice agility. The Scrum Master must help them to effectively communicate each other, but be careful, don’t act as a go-between for them.
-
Question 46 of 77
46. Question
1 pointsIs one of the Scrum Theory Pillars:
Correct
Congrats! 4.
Incorrect
Incorrect: Adaptation, Transparency, and Inspection are the Scrum Theory Pillars. Scrum as Agile framework, is mainly about adaptation (instead of prediction).
-
Question 47 of 77
47. Question
1 pointsWhich two statements are true about the Product Owner?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: The Product Owner is responsible for maximizing the value of the product resulting from work of the Development Team and prioritize the Product Backlog items accordingly.: There is no role of Project Manager or equivalent in the Scrum framework.: Product Owner can be dedicated part-time to one project.
-
Question 48 of 77
48. Question
1 pointsWho can remove and replace Sprint Backlog items during the Sprint?
Correct
Congrats! 6.
Incorrect
Incorrect: Nobody can remove or change the Sprint Backlog items when the Sprint Planning is finished. The only exception is when there’s still time and the team has completed all items, in which scenario they will pull the next item from the top of the Product Backlog.
-
Question 49 of 77
49. Question
1 pointsEvery increment should be released.
Correct
Congrats! 2.
Incorrect
Incorrect: Every increment should be potentially releasable and completed based on the Definition of Done. However, increment doesn’t have to be actually released. The Product Owner decides if make sense to release or not.
-
Question 50 of 77
50. Question
1 pointsWhat’s the main responsibility of the Project Manager?
Correct
Congrats! 4.
Incorrect
Incorrect: We have only just three roles in Scrum: Product Owner , Scrum Master , and Development Team . It’s not permitted to define new roles and the Development Team must be self-organizing and cross-functional.
-
Question 51 of 77
51. Question
1 pointsWhat is the Scrum role who know the most about the project performance?
Correct
Congrats! 4.
Incorrect
Incorrect: The Product Owner is responsible for measuring project performance. The Development Team only measures the performance of the current Sprint.
-
Question 52 of 77
52. Question
1 pointsWhen the Development Team find itself in a situation where doesn’t have the proper tools and infrastructure, what are the best two things to do?
Correct
Congrats! 3. 4.
Incorrect
Incorrect: Sprint Zero doesn´t exist in the Scrum framework and all the Sprints should be able to create an Increment of working software. The Inspections and Adaptation concepts are about making adjustments gradually through the project, this includes infrastructure and tools.
-
Question 53 of 77
53. Question
1 pointsWhich two of the following is true about Scrum?
Correct
Congrats! 1. 2.
Incorrect
Incorrect: Scrum is not a methodology or body of knowledge, is a framework. A lot of organizations start implementing Agile in a cultural context that is mostly non-Agile.This creates tensions and frictions that the teams adopting Agile have to deal with.: According to the Scrum Guide, a Sprint is a time-box of 4 weeks maximum (can be less).
-
Question 54 of 77
54. Question
1 pointsWhat is the max time-box duration for a Sprint Planning meeting?
Correct
Congrats! 2.
Incorrect
Incorrect: Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the event is usually shorter.
-
Question 55 of 77
55. Question
1 pointsAre Scrum values.
Correct
Congrats! 1.
Incorrect
Incorrect: The Scrum values named in the Scrum guide are Commitment, Courage, Focus, Openness, Respect. The Scrum Theory Pillars are Transparency, Inspection, Adaptation.
-
Question 56 of 77
56. Question
1 pointsWhose decision is it to establish the tasks to be performed during the Sprint?
Correct
Congrats! 3.
Incorrect
Incorrect: The Development Team is self-organized, hence its members decide on the way they work and on the technical approach of the project.
-
Question 57 of 77
57. Question
1 pointsAre Scrum pillars.
Correct
Congrats! 2.
Incorrect
Incorrect: The Scrum Theory Pillars named in the Scrum guide are Transparency, Inspection, Adaptation. The Scrum values are Commitment, Courage, Focus, Openness, Respect.
-
Question 58 of 77
58. Question
1 pointsWhat should do the Scrum Team during the Hardening Sprint
Correct
Congrats! 1.
Incorrect
Incorrect: There’s no such thing as Sprint Hardening Sprint. We have a Sprint 1, Sprint 2 and go on, a surprise additional Sprint or a planned buffer sprint is not in alignment with Agile principles of timeboxed development to create a potentially shippable product. If the stories are correctly prioritized, the Definition of Done is unambiguous, and the product backlog is regularly refined based on business priorities, the teams should be able to complete the development tasks.
-
Question 59 of 77
59. Question
1 pointsWhen we have more risk we need longer Sprints.
Correct
Congrats! 2.
Incorrect
Incorrect: When we have shorter Sprints, there are more opportunities to show progress, and receive feedback, validate our knowledge and therefore Adapt. So, shorter Sprints are preferred when we have higher risks.
-
Question 60 of 77
60. Question
1 pointsFrom the following options, what is the best way a Scrum Master can increase the team productivity?
Correct
Congrats! 4.
Incorrect
Incorrect: Eliminar los impedimentos y facilitar los eventos de Scrum según se solicite o necesite es el tipo de cosas que se esperan del Scrum Master. El equipo de desarrollo está autoorganizado, Scrum Master no les da órdenes. El Scrum Master debe asegurarse de que el Propietario del Producto sepa cómo organizar la Lista de Producto para maximizar el valor, pero el Scrum Master no es responsable de hacerlo.
-
Question 61 of 77
61. Question
1 pointsWhen is a backlog item considered complete?
Correct
Congrats! 2.
Incorrect
Incorrect: When the item is complete based on the Definition of Done, therefore the real and final users can use it, which also means an Increment of working software which is potentially releasable has been created.
-
Question 62 of 77
62. Question
1 pointsThe structure of the Daily Scrum is set by the Development Team.
Correct
Congrats! 1.
Incorrect
Incorrect: The Development Team owns the Daily Scrum meetings, they can be conducted in different ways but always focuses on progress toward the Sprint Goal.
-
Question 63 of 77
63. Question
1 pointsHow much time by day, should the Development Team work on their tasks?
Correct
Congrats! 4.
Incorrect
Incorrect: Agile principles support processes which promote sustainable development, this means that every person related directly to a project should be able to maintain a constant pace indefinitely.
-
Question 64 of 77
64. Question
1 pointsProduct Owner says the customer has security concerns. Where can be addressed these concerns in Scrum? (Select 2 answers).
Correct
Congrats! 1. 3.
Incorrect
Incorrect: Many nonfunctional features, like security, can be added as acceptance criteria and tests in the Definition of Done to be applied to all or some Product Backlog items.: We can have some specific security concerns that can be items in the Product Backlog.: The Development Team is cross-functional and self-sufficient, should be capable of taking care of every aspect of the product, including security.
-
Question 65 of 77
65. Question
1 pointsWhat is what usually happens when the Scrum Team becomes mature through the project?
Correct
Congrats! 1. 4.
Incorrect
Incorrect: Every team tends to learn more and mature during the project, so the techniques, expertise, skills and methods improve too. This must impact on the definition of Done.: All Scrum roles, events, and artifacts are necessary and shouldn’t be omitted for any reason
-
Question 66 of 77
66. Question
1 pointsWhen can a Development Team cancel a Sprint?
Correct
Congrats! 2.
Incorrect
Incorrect: The only one who can cancel a Sprint is the Product Owner. This can happen when he realizes that the Sprint doesn’t make sense anymore, because the Sprint Goal has become obsolete.
-
Question 67 of 77
67. Question
1 pointsWho is responsible for getting buy-in from stakeholders?
Correct
Congrats! 3.
Incorrect
Incorrect: The Product Owner is responsible for getting buy-in, understanding the stakeholders’ concerns and goals. The Product Owner communicates and represents the desires of the client.
-
Question 68 of 77
68. Question
1 pointsAt the beginning of the Sprint, the Development Team has neither the tools nor infrastructure needed to complete the current Sprint Backlog Items. What two things the Scrum Master should do?
Correct
Congrats! 1. 4.
Incorrect
Incorrect: Infrastructure and tools are not prepared upfront, because it requires a complete understanding of the whole project and product, which is usually not the case, so we need to hold on to the adaptation pillar. The required infrastructure and tools will be prepared gradually through the project because they depend on the product we’re going to create, which in turn is defined through the project.
-
Question 69 of 77
69. Question
1 pointsWhen should the Scrum Team held the Sprint Retrospective meeting?
Correct
Congrats! 2.
Incorrect
Incorrect: The Sprint Retrospective occurs always after the Sprint Review and prior to the next Sprint Planning.
-
Question 70 of 77
70. Question
1 pointsWhich of the following is not a Development Team responsibility?
Correct
Congrats! 2.
Incorrect
Incorrect: Remember that Development Team is self-organized. Therefore, It is team’ responsibility to measure its own productivity and performance throughout the Sprint, figure out its own process, plan, estimate and optimize the work required for items and the Sprint Goal, and to resolve their own conflicts.
-
Question 71 of 77
71. Question
1 pointsWho can decide add more work to the Sprint Backlog during the Sprint?
Correct
Congrats! 1.
Incorrect
Incorrect: After de Sprint Planning the items pulled from Sprint Backlog can’t be changed. But the broken down tasks created by de Development Team to complete the work are always changing and adapting according to their practices, techniques, and knowledge.
-
Question 72 of 77
72. Question
1 pointsWho must do the work required for Product Backlog items, in order to create a potentially releasable Increment?
Correct
Congrats! 2.
Incorrect
Incorrect: The Development Team is cross-functional and does the work of delivering a potentially releasable Increment of “Done” product at the end of each Sprint. They don’t use any external help. Is not recommended, nor is a good practice, for the Scrum Master or Product Owner working as developers.
-
Question 73 of 77
73. Question
1 pointsA programmer is not working properly and is blocking the progress of the team and their activities constantly. Who should decide about the future of this person as a member of the team?
Correct
Congrats! 1.
Incorrect
Incorrect: The Development Team is Self-Organized, therefore this is a decision and responsibility of its members. Of course, the Scrum Master must address and support this decision since is also an impediment.
-
Question 74 of 77
74. Question
1 pointsWhat is the right criteria to order the Product Backlog?
Correct
Congrats! 3.
Incorrect
Incorrect: The decision on the order of items can be influenced by a committee, the customer, or any other stakeholder, but only the Product Owner decides what makes the most sense to optimize the value of the work being done by the Development Team.
-
Question 75 of 77
75. Question
1 pointsThe Product Owner decides how many Product Backlog items should be selected for next Sprint.
Correct
Congrats! 3.
Incorrect
Incorrect: The Product Owner sets the objective that the Sprint should achieve although can be influenced by the Development Team. However, only members of the Development Team create the Increment, that’s why only they pull the Product Backlog items in order to accomplish Sprint Goal.
-
Question 76 of 77
76. Question
1 pointsWho must attend to the Daily Scrum?
Correct
Congrats! 3.
Incorrect
Incorrect: The only ones who must attend are the members of the Scrum Team. The Scrum Master ensures that the Development Team has the meeting but he doesn’t need to be present at the meeting. Anyone else can attend but don’t “must” be there, and notice that the guests only watch and listen they don’t participate.
-
Question 77 of 77
77. Question
1 pointsWhich two of the following are Scrum Master responsibilities?
Correct
Congrats! 1. 2.
Incorrect
Incorrect: The Scrum Master serves the organization in several ways, including leading and coaching the organization in its Scrum adoption, planning Scrum implementations within the organization, also the Scrum Master serves the Development Team in several ways, including, removing impediments to the Development Team’s progress.