Here you have the fifth part of the 500 questions’ exam. Enjoy it!
Quiz-summary
0 of 100 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
Information
Quiz description Scrum Master Certified I. 500 questions (401 – 500)
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 100 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- Answered
- Review
-
Question 1 of 100
1. Question
1 pointsThe heart of Scrum is a Sprint, a time-box of one month or less during which a “Done”, usable and potentially releasable product Increment is created
Correct
Congrats! 1.
Incorrect
-
Question 2 of 100
2. Question
1 pointsWhat is most important in all Scrum projects? Select three answers.
Correct
Congrats! 1. 3. 4.
Incorrect
-
Question 3 of 100
3. Question
1 pointsWhich of the following main events are defined by Scrum Framework? Select three answers.
Correct
Congrats! 1. 2. 3.
Incorrect
-
Question 4 of 100
4. Question
1 pointsThe Scrum Team should choose at least one high priority process improvement, identified during the Sprint Retrospective and place it in the Product Backlog.
Correct
Congrats! 2.
Incorrect
-
Question 5 of 100
5. Question
1 pointsSprint Backlog and all of its items are collectively owned by the Scrum Team.
Correct
Congrats! 1.
Incorrect
-
Question 6 of 100
6. Question
1 pointsWhich of the below are roles on a Scrum Team? Select two answers.
Correct
Congrats! 1. 3.
Incorrect
-
Question 7 of 100
7. Question
1 pointsThe Daily Scrum always should take exactly 15 minutes. For example, if your team managed doing it in 5 minutes, you should spend 10 more minutes on some useful team activity like Product Backlog refinement, but not more.
Correct
Congrats! 2.
Incorrect
-
Question 8 of 100
8. Question
1 pointsWhat does Burn-down Chart show?
Correct
Congrats! 3.
Incorrect
-
Question 9 of 100
9. Question
1 pointsThe purpose of the Sprint Retrospective is to… Select three answers.
Correct
Congrats! 1. 2. 5.
Incorrect
-
Question 10 of 100
10. Question
1 pointsWho is allowed to participate in the Daily Scrum?
Correct
Congrats! 1.
Incorrect
-
Question 11 of 100
11. Question
1 pointsHow does the Scrum Master serve the Development Team? Select three answers.
Correct
Congrats! 2. 3. 4.
Incorrect
-
Question 12 of 100
12. Question
1 pointsThe Product Owner is the sole person responsible for managing the Product Backlog.
Correct
Congrats! 1.
Incorrect
-
Question 13 of 100
13. Question
1 pointsIf an inspector determines that one or more aspects of a process deviate outside acceptable limits, when must an adjustment be made?
Correct
Congrats! 4.
Incorrect
-
Question 14 of 100
14. Question
1 pointsImagine you are a Scrum Master in a small Organization that tries to adopt Scrum. There are 10 developers and the Product Owner. How can they be divided into teams? Select two answers.
Correct
Congrats! 3. 4.
Incorrect
-
Question 15 of 100
15. Question
1 pointsEach Increment should be released at the end of each Sprint.
Correct
Congrats! 2.
Incorrect
-
Question 16 of 100
16. Question
1 pointsWhich statement best describes the Sprint Backlog?
Correct
Congrats! 3.
Incorrect
-
Question 17 of 100
17. Question
1 pointsThe Product Backlog is baselined at the beginning of each Sprint for the duration of the Sprint.
Correct
Congrats! 1.
Incorrect
-
Question 18 of 100
18. Question
1 pointsWho must participate in Sprint Review?
Correct
Congrats! 1.
Incorrect
-
Question 19 of 100
19. Question
1 pointsWhat are the outcomes of a Daily Scrum? Select two answers.
Correct
Congrats! 1. 3.
Incorrect
-
Question 20 of 100
20. Question
1 pointsThe Scrum Master shouldn’t allow the Product Owner to go to the Sprint Planning meeting without having the Sprint Goal prepared.
Correct
Congrats! 2.
Incorrect
-
Question 21 of 100
21. Question
1 pointsWhich of the following is a right action from the Scrum Master in response to a Product Owner who has problems managing the Product Backlog?
Correct
Congrats! 4.
Incorrect
-
Question 22 of 100
22. Question
1 pointsEvery Scrum project should have a Scrum Master and a Product Owner.
Correct
Congrats! 3.
Incorrect
-
Question 23 of 100
23. Question
1 pointsWhat are common benefits of self-organization? Select two answers.
Correct
Congrats! 2. 3.
Incorrect
-
Question 24 of 100
24. Question
1 pointsScrum is a newer way of doing things to address complex problems. It is a newer way because…
Correct
Congrats! 3.
Incorrect
-
Question 25 of 100
25. Question
1 pointsNine (9) Scrum Teams are working on a single product. Which of the following is the best way of planning Sprints?
Correct
Congrats! 3.
Incorrect
-
Question 26 of 100
26. Question
1 pointsWho knows most about the progress towards a business objective or a release?
Correct
Congrats! 1.
Incorrect
-
Question 27 of 100
27. Question
1 pointsWhich of the following statements best describes the role that the Daily Scrum plays in the monitoring of a Scrum project?
Correct
Congrats! 2.
Incorrect
-
Question 28 of 100
28. Question
1 pointsWhat is the maximum length of a sprint?
Correct
Congrats! 4.
Incorrect
-
Question 29 of 100
29. Question
1 pointsThe Scrum Master enforces the rule that only Product Owner and Development Team members participate in the Daily Scrum.
Correct
Congrats! 2.
Incorrect
-
Question 30 of 100
30. Question
1 pointsA Scrum Master is working with a Development Team that has members in different physical locations. The Development Team meets in a variety of meeting rooms and has much to do logistically (for example, set up conference calls) before the Daily Scrum. What action should the Scrum Master take?
Correct
Congrats! 2.
Incorrect
-
Question 31 of 100
31. Question
1 pointsThe Product Owner must release each increment to production.
Correct
Congrats! 4.
Incorrect
-
Question 32 of 100
32. Question
1 pointsWhen a Development Team is having trouble delivering a working increment because they do not understand a functional requirement, what should they do?
Correct
Congrats! 1.
Incorrect
-
Question 33 of 100
33. Question
1 pointsSprint burndown charts are an efficient tracking tool, because they show…
Correct
Congrats! 2.
Incorrect
-
Question 34 of 100
34. Question
1 pointsIf “Done” for an increment is not a convention of the development organization, the Development Team of the Scrum Team must define a Definition of “Done” appropriate for the product
Correct
Congrats! 1.
Incorrect
-
Question 35 of 100
35. Question
1 pointsThe Scrum Team consists of a Product Owner, the Development Team, a Scrum Master and the Stakeholders.
Correct
Congrats! 2.
Incorrect
-
Question 36 of 100
36. Question
1 pointsUpon what kind of process control is Scrum not based? Select three answers.
Correct
Congrats! 1. 2. 4.
Incorrect
-
Question 37 of 100
37. Question
1 pointsWhat happens if the Development Team cannot complete its work by the end of the Sprint?
Correct
Congrats! 1.
Incorrect
-
Question 38 of 100
38. Question
1 pointsHow many hours per day should a person on a Scrum Team works?
Correct
Congrats! 4.
Incorrect
-
Question 39 of 100
39. Question
1 pointsWhich of these may a Development Team deliver at the end of a Sprint? Select two answers.
Correct
Congrats! 1. 4.
Incorrect
-
Question 40 of 100
40. Question
1 pointsItems in the Product Backlog are ordered by the value they bring to the project. It is due to the Product Owner to realize the best way of calculating the “value”.
Correct
Congrats! 1.
Incorrect
-
Question 41 of 100
41. Question
1 pointsThe Scrum Team defines “Done” at the beginning of the project and would not consider a job completed, unless it matches the definition of “Done”.
Correct
Congrats! 2.
Incorrect
-
Question 42 of 100
42. Question
1 pointsWhen many Scrum Teams are working on a project, what best describes the Definition of “Done”?
Correct
Congrats! 1.
Incorrect
-
Question 43 of 100
43. Question
1 pointsThe Product Backlog is maintained by…
Correct
Congrats! 3.
Incorrect
-
Question 44 of 100
44. Question
1 pointsWhich items constitute the Sprint Backlog and are often estimated in hours?
Correct
Congrats! 4.
Incorrect
-
Question 45 of 100
45. Question
1 points_____ can change the priority of items in the _____ backlog at any time.
Correct
Congrats! 3.
Incorrect
-
Question 46 of 100
46. Question
1 pointsThe work to be performed in the Sprint is planned at the Sprint Planning.
Correct
Congrats! 1.
Incorrect
-
Question 47 of 100
47. Question
1 pointsWhy according to the Scrum framework is it difficult for Product Owners to make changes to a sprint that is underway?
Correct
Congrats! 2.
Incorrect
-
Question 48 of 100
48. Question
1 pointsWhat is the primary purpose of the Sprint Review?
Correct
Congrats! 1.
Incorrect
-
Question 49 of 100
49. Question
1 pointsFewer than five Development Team members decreases interaction and results in smaller productivity gains. More than nine members simply requires too much coordination.
Correct
Congrats! 1.
Incorrect
-
Question 50 of 100
50. Question
1 pointsAn organization needs to structure hundreds of Developers into Scrum Teams. You as a Scrum Master will…
Correct
Congrats! 3.
Incorrect
-
Question 51 of 100
51. Question
1 pointsAll Development Teams working on the same Product should use the same Product Backlog.
Correct
Congrats! 2.
Incorrect
-
Question 52 of 100
52. Question
1 pointsWhat happens to the definition of “Done” when multiple Development Teams are working on a single project?
Correct
Congrats! 2.
Incorrect
-
Question 53 of 100
53. Question
1 pointsThe Development Team should have all the skills and competencies required to…
Correct
Congrats! 1.
Incorrect
-
Question 54 of 100
54. Question
1 pointsA Development Team with 5 members has been using 15 minute Daily Scrums. Three new members have joined the team. How long should the Daily Scrum meetings be after that?
Correct
Congrats! 2.
Incorrect
-
Question 55 of 100
55. Question
1 pointsWhich of the following items is not time-boxed?
Correct
Congrats! 5.
Incorrect
-
Question 56 of 100
56. Question
1 pointsWhich of the following is an opportunity to inspect and adapt?
Correct
Congrats! 5.
Incorrect
-
Question 57 of 100
57. Question
1 pointsHow long is a Sprint Review in a one month Sprint?
Correct
Congrats! 3.
Incorrect
-
Question 58 of 100
58. Question
1 pointsIn a new Scrum Team, a Scrum Master notices that a Developer works on a task that is not contributing to the Sprint Goal or the Sprint Backlog. What should the Scrum Master do?
Correct
Congrats! 2.
Incorrect
-
Question 59 of 100
59. Question
1 pointsThe Scrum Master is focused primarily on the Scrum Team and usually does not care about those outside the Scrum Team.
Correct
Congrats! 1.
Incorrect
-
Question 60 of 100
60. Question
1 pointsA new developer is having continuing conflicts with existing Development Team members and creating a hostile environment. lf necessary, who is responsible for removing the team member?
Correct
Congrats! 3.
Incorrect
-
Question 61 of 100
61. Question
1 pointsWhich two things are appropriate for a Scrum Master to do if the Development Team does not have the engineering tools and infrastructure to completely finish each selected Product Backlog item? Select two answers.
Correct
Congrats! 3. 5.
Incorrect
-
Question 62 of 100
62. Question
1 pointsThe Development Team uses Story Points to estimate User stories. Halfway through a Sprint, you are not seeing the progress you expected. The Team feels some Stories are not estimated correctly, when compared to other Stories. How should the Scrum Master address this?
Correct
Congrats! 1.
Incorrect
-
Question 63 of 100
63. Question
1 pointsHow a Team knows when a backlog item is done?
Correct
Congrats! 4.
Incorrect
-
Question 64 of 100
64. Question
1 pointsWhat are the advantages of maintaining consistent Sprint length throughout the project?
Correct
Congrats! 4.
Incorrect
-
Question 65 of 100
65. Question
1 pointsEach increment contains only “Done” functionality that must be released immediately.
Correct
Congrats! 2.
Incorrect
-
Question 66 of 100
66. Question
1 pointsWhich one of the following statements is correct regarding acceptance of any deliverables on a Scrum Project?
Correct
Congrats! 2.
Incorrect
-
Question 67 of 100
67. Question
1 pointsWho has the final say on the order of the Product Backlog?
Correct
Congrats! 4.
Incorrect
-
Question 68 of 100
68. Question
1 pointsDuring the Sprint Review, the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based on that and any changes to the Product Backlog during the Sprint, attendees collaborate on the next things that could be done to optimize value.
Correct
Congrats! 1.
Incorrect
-
Question 69 of 100
69. Question
1 pointsA Development Team has following condition under the Definition of “Done”: “All the code to be reviewed and approved by Industry Coding Standard Organization. This Industry Coding Standard Organization is a third party Subject Matter Expert outside the Scrum Team. Which statement is true?
Correct
Congrats! 1.
Incorrect
-
Question 70 of 100
70. Question
1 pointsWhen must a new increment of working software be available?
Correct
Congrats! 1.
Incorrect
-
Question 71 of 100
71. Question
1 pointsThe Sprint Backlog does not change after the Sprint Planning.
Correct
Congrats! 2.
Incorrect
-
Question 72 of 100
72. Question
1 pointsA Product Owner requests Development Team to help them with some tasks related to Product Backlog maintenance. Which of the following is true? Select two answers.
Correct
Congrats! 2. 4.
Incorrect
-
Question 73 of 100
73. Question
1 pointsThe Sprint Review is an opportunity to review…
Correct
Congrats! 1.
Incorrect
-
Question 74 of 100
74. Question
1 pointsWho performs inspections in Scrum events? Select three answers.
Correct
Congrats! 1. 4. 5.
Incorrect
-
Question 75 of 100
75. Question
1 pointsThe Development Team should not be interrupted during the Sprint. The Sprint Goal should remain intact. These are conditions that foster creativity, quality and productivity. Based on this, which of the following is false?
Correct
Congrats! 2.
Incorrect
-
Question 76 of 100
76. Question
1 pointsHow is external management involved in the Daily Scrum?
Correct
Congrats! 1.
Incorrect
-
Question 77 of 100
77. Question
1 pointsAfter a Sprint Review, the Product Owner deems that the Product has come to the end of its life and the Product Backlog can be closed. The next immediate step is…
Correct
Congrats! 2.
Incorrect
-
Question 78 of 100
78. Question
1 pointsSprint Planning helps in…
Correct
Congrats! 4.
Incorrect
-
Question 79 of 100
79. Question
1 pointsThe Scrum Team crafts the following Sprint Goal: “All the Sprint code should have passed 100% automated unit tests”. Which of the following is true?
Correct
Congrats! 1.
Incorrect
-
Question 80 of 100
80. Question
1 pointsWhat are some examples of Product Backlog management techniques in which a Scrum Master can coach the Product Owner and the Development Team? Select three answers.
Correct
Congrats! 1. 2. 3.
Incorrect
-
Question 81 of 100
81. Question
1 pointsWhich of the following should be considered for setting the duration of Sprints?
Correct
Congrats! 4.
Incorrect
-
Question 82 of 100
82. Question
1 pointsThe Product Owner can delegate her/his responsibilities to the Development Team.
Correct
Congrats! 2.
Incorrect
-
Question 83 of 100
83. Question
1 pointsWhich of the following are acceptable ways of handling infrastructure and architecture? Select two answers.
Correct
Congrats! 1. 2.
Incorrect
-
Question 84 of 100
84. Question
1 pointsWhich two statements explain why the Definition of “Done” is important to the Product Owner? Select two answers.
Correct
Congrats! 1. 3.
Incorrect
-
Question 85 of 100
85. Question
1 pointsEach event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection.
Correct
Congrats! 2.
Incorrect
-
Question 86 of 100
86. Question
1 pointsThe Development Team meets every day to inspect the progress and adapt the next day plan. If the Daily Scrum exposes the need to re-plan the rest of the Sprint, these re-planning activities happen…
Correct
Congrats! 2.
Incorrect
-
Question 87 of 100
87. Question
1 pointsIn order to make investment decisions, the Product Owner is likely to look at the Total Cost of Ownership (TCO) of the product being built. What costs will a Product Owner take into account?
Correct
Congrats! 3.
Incorrect
-
Question 88 of 100
88. Question
1 pointsIt is preferable to decompose the Product Backlog items, so that each team can produce useable business functionality instead of producing a technical component.
Correct
Congrats! 1.
Incorrect
-
Question 89 of 100
89. Question
1 pointsA selection of items from the Product Backlog a Development Team deems feasible for implementation in a Sprint is called…
Correct
Congrats! 3.
Incorrect
-
Question 90 of 100
90. Question
1 pointsShould User Stories be part of the documentation generated by a Scrum project?
Correct
Congrats! 1.
Incorrect
-
Question 91 of 100
91. Question
1 pointsAfter the Sprint Review, production release in Scrum requires…
Correct
Congrats! 5.
Incorrect
-
Question 92 of 100
92. Question
1 pointsThe Scrum Team gathers for Sprint Planning meeting. The Product Owner has some Product Backlog items but the Development Team finds that they do not provide enough information to understand the work involved to make forecast. The next best thing to do is:
Correct
Congrats! 3.
Incorrect
-
Question 93 of 100
93. Question
1 pointsWhen may a Development Team change its engineering practices?
Correct
Congrats! 1.
Incorrect
-
Question 94 of 100
94. Question
1 pointsWhat type of testing is usually done during the Sprint?
Correct
Congrats! 3.
Incorrect
-
Question 95 of 100
95. Question
1 pointsA Scrum Team develops software. Only when the Product Owner decides to go for the release, the team creates end user documentation for the Product Increment at that point.
Correct
Congrats! 3.
Incorrect
-
Question 96 of 100
96. Question
1 pointsDuring the Daily Scrum, a team member says he does not know when his task will be complete. Which of the following is true?
Correct
Congrats! 3.
Incorrect
-
Question 97 of 100
97. Question
1 pointsProduct Backlog items are refined by…
Correct
Congrats! 3.
Incorrect
-
Question 98 of 100
98. Question
1 pointsThe Sprint Backlog emerges during the Sprint because the Development Team modifies it throughout the Sprint. In the middle of the Sprint, new work is added to Sprint Backlog. As a result, estimated remaining work will…
Correct
Congrats! 1.
Incorrect
-
Question 99 of 100
99. Question
1 pointsWhich of the following is a subject of the Sprint Retrospective?
Correct
Congrats! 1.
Incorrect
-
Question 100 of 100
100. Question
1 pointsThe Sprint Goal reflects the intended business functionality that will be delivered in a Sprint.
Correct
Congrats! 2.